CPS National were recently contracted by an Australian telecommunications customer to assist in the installation of a Hybrid Solar Power System to support a recently upgraded telecommunications tower located within the Flinders Ranges. The Hybrid Solar Power System was commissioned to help improve service for customers within the area who regularly experienced little to no network connection whenever a power outage occurred.

The CPS National team constructed 5 solar arrays totalling 60 panels, 8 power cabinets, a generator and 2000 litre generator tank.

Site access was often impacted due to inclement weather conditions in South Australia’s Flinders Ranges. Despite these additional challenges, the project was successfully delivered on time and of a high standard of quality.

Download the PDF here