The solar off-grid site required extra power resources to power on-site equipment. An initial audit preceded the design, installation and commissioning of the solar PV and battery off-grid system. Adding to the challenge was the requirement to maintain the load on-site whilst the work was being carried out. This in conjunction with the remote location created a challenge in itself.

Once completed, CPS National conducted baseline PV testing which would set a comparison for future site testing. This project was testament to CPS National’s innovative approach and ability to deliver unique energy efficient and sustainable projects.